Job Vacancies
CRBC (M) HOLDINGS SDN.BHD. - 1. PLANNER MANAGER (Kuching), Bachelor’s Degree in Engineering, Construction Management or related field preferred; Minimum 10 years’ hands-on experience; Develop and update project schedules.
2. SITE ENGINEER / SITE SUPERVISOR (Kuching), Diploma or Degree in Civil Engineering or related discipline; 2–3 years of relevant site experience; Supervise daily construction site activities.
3. PROJECT MANAGER (Kuching), Degree in Construction Management, Civil Engineering, or related field; Proven experience in construction project management; Manage the overall construction project.
4. BUS DRIVER (Kuching), Minimum 1–2 years’ experience driving buses or heavy vehicles preferred; Safely operate a 24-seater bus; valid CDL and PSV.
5. TRAFFIC CONTROLLER (Kuching), Control and manage traffic flow; Physically fit and able to work outdoors; Able to work from 4:30 PM to 12:30 AM.
Email Resume
Advertised on: 2026-06-18    View Rate From: JobStock(130), JobStock App(25), Facebook(52), Twitter(8) , More Details
Job Details BUS DRIVER
PLANNER MANAGER
PROJECT MANAGER
SITE ENGINEER / SITE SUPERVISOR
TRAFFIC CONTROLLER
More Jobs
Share: