Job Vacancies
JURUTERA MINSAR CONSULT SDN BHD - 1. RESIDENT ENGINEER (RE) (Lawas), Recognised Degree in Civil Engineering; Minimum 15 years of related working experience; lead, coach and manage members of the supervision team.
2. ASSISTANT RESIDENT ENGINEER (ARE) (Kuching, Lawas, Limbang & Marudi), Recognised Degree in Civil Engineering; Minimum 5 years; 7 years for ARE – Bridge projects.
3. INSPECTOR-OF-WORKS / LABORATORY TECHNICIAN / SURVEY TECHNICIAN (Kuching, Lawas, Limbang & Gedong), Diploma / Certificate in Civil Engineering or SPM; minimum 5 years of related working experience; monitoring and inspection.
4. DESIGN ENGINEERS (CIVIL & STRUCTURAL / ROAD & BRIDGES) (Kuching), Minimum Bachelor’s Degree in Civil Engineering; Preferably 2 to 5 years or more experience; Fresh graduates are encouraged to apply.
5. PROJECT COORDINATOR (CIVIL & STRUCTURAL / ROAD & BRIDGE) (Kuching), Minimum Bachelor’s Degree in Civil Engineering; Preferably 2 to 5 years; project planning, scheduling, and reporting.
Email Resume
Advertised on: 2026-07-01    View Rate From: JobStock(139), JobStock App(33), Facebook(57), Twitter(8) , More Details
Job Details ASSISTANT RESIDENT ENGINEER (ARE)
DESIGN ENGINEERS (CIVIL & STRUCTURAL / ROAD & BRIDGES)
INSPECTOR-OF-WORKS / LABORATORY TECHNICIAN / SURVEY TECHNICIAN
PROJECT COORDINATOR (CIVIL & STRUCTURAL / ROAD & BRIDGE)
RESIDENT ENGINEER (RE)
More Jobs
Share: