Job Vacancies
ADVERTISER - 1. PROJECT MANAGER (Kuching), Diploma / Degree in Civil Engineering; Minimum 5-10 years experience; Manage overall project planning.
2. SITE ENGINEER / SITE SUPERVISOR (Kuching), Diploma / Degree in Civil Engineering; Supervise site works and monitor daily project progress.
3. SURVEYOR (Kuching), Diploma / Certificate in Surveying; Able to operate surveying instruments independently; Willing to work at site.
4. ARCHITECTURE DRAFTSPERSON (Kuching), Certificate / Diploma / Experience in related field; Proficient in AutoCAD and Sketchup related software.
5. ASSISTANT ARCHITECT (Kuching), Degree / Diploma in Architecture; Assist in preparing architectural drawings, layouts, and design documents.
Email Resume
Advertised on: 2026-05-20    View Rate From: JobStock(720), JobStock App(65), Facebook(277), Twitter(14) , More Details
Job Details ARCHITECTURE DRAFTSPERSON
ASSISTANT ARCHITECT
PROJECT MANAGER
SITE ENGINEER / SITE SUPERVISOR
SURVEYOR
More Jobs
Share: