Job Vacancies

JAYALU SDN BHD


1. SITE ENGINEER (Kuching), Education: Degree/Diploma Civil; Exp: 2+ yrs; manage projects, supervise site & reports, liaise clients/subcons/QS; MS Project/AutoCAD; proactive; able OT.
2. SITE SUPERVISORS (Kuching), Education: Diploma/Cert Civil or SPM; Exp: 2+ yrs; supervise daily site ops, ensure spec/standard, read drawings, keep records; strong coordination; able OT.
3. LORRY DRIVERS (Kuching), Education: –; Exp: 2+ yrs; Class E with GDL; safe driving, support site logistics.
4. EXCAVATOR OPERATORS (Kuching), Education: –; Exp: 3+ yrs; operate excavator safely/efficiently; earthworks; basic maintenance.
call 016-8799118 or Email Resume
JAYALU SDN BHD - 1. SITE ENGINEER (Kuching), Education: Degree/Diploma Civil; Exp: 2+ yrs; manage projects, supervise site & reports, liaise clients/subcons/QS; MS Project/AutoCAD; proactive; able OT.
2. SITE SUPERVISORS (Kuching), Education: Diploma/Cert Civil or SPM; Exp: 2+ yrs; supervise daily site ops, ensure spec/standard, read drawings, keep records; strong coordination; able OT.
3. LORRY DRIVERS (Kuching), Education: –; Exp: 2+ yrs; Class E with GDL; safe driving, support site logistics.
4. EXCAVATOR OPERATORS (Kuching), Education: –; Exp: 3+ yrs; operate excavator safely/efficiently; earthworks; basic maintenance.
call 016-8799118 or Email Resume
Advertised on: 2025-11-06    View Rate From: JobStock(87), JobStock App(23), Facebook(38), Twitter(13) , More Details
More Jobs
Share:
Download JobStock® Mobile App