Job Vacancies
JURUTERA IRIAZ SDN BHD - 1. ELECTRICAL ENGINEER (Kuching), Edu: Bachelor’s in Electrical Eng; Exp: 1–3 yrs (fresh grads welcome); handle CAD design, drawings, calculations, reports, meetings, site visits, interior travel.
2. MECHANICAL ENGINEER (Kuching), Edu: Bachelor’s in Mechanical Eng; Exp: 1–3 yrs (fresh grads welcome); perform CAD design, drawings, calculations, reporting, client meetings, site visits, interior travel.
3. INSPECTOR OF WORKS / CLERK OF WORKS (KERANI TAPAK) (Sibu/Bintulu), Edu: Diploma in Mech/Elect Eng or Building Services; Exp: 1–5 yrs; supervise M&E works, inspect vs drawings, monitor progress, keep records, liaise clients/consultants/contractors.
4. RESIDENT ENGINEER (ELECTRICAL) (Miri) – 1 post; Edu: Bachelor’s in Electrical Eng; Exp: 1–5 yrs; supervise E&M works, CAD tasks, site inspections, progress reports, liaise clients, travel between multiple sites.
Call 082-528709 or Email Resume
Advertised on: 2025-12-05    View Rate From: JobStock(115), JobStock App(19), Facebook(12), Twitter(10) , More Details
Job Details ELECTRICAL ENGINEER
INSPECTOR OF WORKS / CLERK OF WORKS (KERANI TAPAK)
MECHANICAL ENGINEER
RESIDENT ENGINEER (ELECTRICAL)
More Jobs
Share:
Download JobStock® Mobile App